- Manufacturer, not a broker — machined in-house at a 6,800 m² Dongguan plant, founded 2005.
- MOQ 1 piece — prototype and production run the same way.
- 3 / 7 / 30-day lead times by complexity, not a blanket promise.
- ±0.003 mm (milling) / ±0.002 mm (turning) / ±0.002 mm tolerances, verified on Hexagon CMMs.
- Quote: email your drawing to [email protected].
Are you a manufacturer or a trading company?
You are buying from a manufacturer, not a trading desk. The parts are cut in-house at a 6,800 m² facility in Hengli Town, Dongguan, founded in 2005 and staffed by 100+ people, running 100+ production machines — 3-axis (50+), 4-axis (20+), 5-axis (20+), 25+ lathes, and 7+ grinders — with its own CMM and metrology bench. The single most important question in overseas sourcing is whether the seller machines its own parts or brokers the work out; here the answer is the former, and the shop floor is open to audit.
What is the minimum order quantity?
The MOQ is 1 piece. There is no production-only minimum, so you can order a single prototype to validate fit and function before committing to volume, then scale the same part on the same machines with the same accountable supplier. Prototyping and production are not two different shops with two different quality bars.
How do I get an accurate quote?
The fastest, most accurate quote comes from a complete request. Four ingredients cover it:
- A 3D model in STEP or IGES — the CAM system reads it directly.
- A 2D PDF drawing naming material, tolerances, and finish — the contract of record.
- Tolerances on the critical dimensions only — flag the two or three features that control function and let the rest default.
- Quantity and finishing — prototype or production, plus any anodizing, plating, heat treatment, or marking.
Email these to [email protected]. You receive a design-for-manufacturing review and a quote, usually within one business day. If you only have a sketch or a photo, expect a short design conversation first, that is competence, not friction, because a supplier that quotes blind is guessing on your invoice.
What lead time should I expect?
Lead time is set by part complexity and the number of process steps, not by a blanket promise.
| Complexity | Approx. lead time | Typical profile |
|---|---|---|
| Simple | ~3 days | Few operations, one material, no finishing |
| Standard | ~7 days | Multiple operations, standard tolerances |
| Complex | ~30 days | 10–20 process steps, or surface finishing / heat treatment |
Complex parts can run 10–20 process steps, and any surface finishing pushes a part into the longer tier. State your target date and the team tells you honestly whether it holds — rather than the other way around.
What materials can you machine?
The material families buyers actually specify, with incoming lots XRF-checked against the mill certificate so the alloy you name is the alloy you receive.
| Material family | Grades | Notes for buyers |
|---|---|---|
| Aluminum | 6061, 6063, 6082, 7075, 2014 | Default for lightweight parts; anodizes well |
| Stainless steel | 303, 304, 316, 316L, 17-4PH | 303 free-machining, 316L corrosion, 17-4PH strength |
| Carbon / alloy steel | 1018, 1045, 4140, 4340, 12L14 | Carburizing or nitriding for wear parts |
| Brass / copper | C360, H62, C110 | Electrical and thermal conductivity |
| Titanium | TA2, TC4 (Grade 2 / 5) | Stress-relief above 500 °C outsourced to a partner |
| Engineering plastics | ABS, POM (Delrin), nylon, PTFE, PEEK | Insulation, low friction, weight reduction |
What tolerances can you hold?
Tolerances are tied to the process and confirmed on a CMM, not printed as a hope.
| Process | Held tolerance | Typical use |
|---|---|---|
| CNC milling | ±0.003 mm | Housings, brackets, prismatic parts |
| CNC turning | ±0.002 mm | Shafts, pins, bushings, round parts |
| Precision grinding | ±0.002 mm | Bearing seats, roundness-critical surfaces |
These are held to process capability. On a representative length characteristic (76.1–76.5 mm), SPC shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim) against an initial-study target of Ppk ≥ 1.67. If a print calls out a dimension that cannot be reliably hit, it is flagged during the design review before any metal is cut.
Read the tolerance band before you read the index. Cpk is a ratio of the tolerance band to the process spread, not an absolute measure of accuracy. The figure above was recorded on a length characteristic with a 0.4 mm band (76.1–76.5 mm) — wide by design. Hold the same process spread against a ±0.005 mm feature and it fails outright. Ask for the band, the subgroup count and the sampling window on every capability number a supplier quotes.
Which certifications do you hold?


Three third-party-surveyed systems, with certificate numbers you can verify with the registrar rather than taking a logo on faith.
| Standard | Certificate number | Scope |
|---|---|---|
| ISO 9001:2015 | 116024/A/0001/UK/En | Machining of metal parts |
| IATF 16949:2016 | 131941/A/0001/SM/En | Manufacture of CNC metal machining parts (excludes product design, Clause 8.3) |
| ISO 14001:2015 | 116024/B/0001/UK/En | Environmental management related to machining of metal parts |
What documents ship with my parts?

You should not have to ask for proof after delivery. Depending on the program, the shipment carries a first-article inspection report, a CMM dimensional report, SPC control charts, and a material certificate, so you can audit what was measured rather than take quality on faith. RoHS / SGS test reports are available where the application requires them.
Can finishing and heat treatment be bundled?
Yes. Surface finishing — standard and hard anodizing, zinc / nickel / silver / gold / chrome plating, powder coating, painting, brushing, and mirror polishing — and heat treatment such as vacuum, bright, carburizing, nitriding, and stress-relief aging can ride the same order, so you receive finished parts rather than machined blanks. In-house ovens reach 500 °C; titanium stress relief above that temperature is outsourced to a qualified partner, and the split is stated rather than hidden.
How do I reach the team?
Email [email protected] or call +86 13126536955. The sales team covers English, Portuguese, Spanish, French, and Chinese, and Japanese, and the factory in Hengli Town, Dongguan is open to visits and audits. Send a drawing and the response usually comes within one business day.
Which materials and industries do you cover?
We machine aluminum, stainless steel, titanium, brass, copper, and Inconel, plus engineering plastics including PEEK and Delrin. These CNC machined parts go into medical, aerospace, automotive, robotics, electronics and defense applications, with the inspection, traceability and documentation each sector requires before it places an order.
How is the price of a CNC part built, and what does each line cover?
A CNC quote is built from four lines — material, setup, cycle, and inspection — and if you read them separately, you can tell where the price moves and where it can be cut. The material line is the bar or billet at the mill price plus the section waste; the setup line is the fixture and the first-article labour, amortised across the quantity; the cycle line is the machine hourly rate multiplied by the cutting time; the inspection line is the Hexagon CMM and the gauge work. A shop that bundles all four into a single number is hiding the assumptions; a shop that breaks them out is a shop that can be checked against the drawing.
The material line moves with the metal market. Aluminium, steel, stainless, titanium, brass, and the engineering plastics each have a mill price that shifts weekly, and if you quote today and order next month, you pay the difference. The material certificate — the heat number, the chemistry, the mechanical properties — is part of the material line, and a shop that runs ISO 9001:2015 and IATF 16949:2016 includes it without a separate charge. The section waste is the difference between the bar section and the finished part; a part machined from a bar two sizes up wastes more and costs more, and the engineer who designs to a standard bar section saves the buyer money.
The setup line is the lever you control. A one-piece prototype carries the full setup cost — the fixture build, the first-article inspection, the program proving; a thousand-piece run amortises the setup to a fraction of the piece price. The crossover where the setup amortises is roughly the point where the setup cost divided by the quantity falls below the cycle cost — typically tens of pieces. The facility behind this guide runs both tiers — MOQ 1 prototype and volume production — on the same 100+ machine floor, so you can quote the prototype and the production volume in the same line and see the setup cost and the amortised cost together.
The cycle line is the machine hourly rate. A 3-axis machining centre runs at a lower rate than a 5-axis; a Swiss-type turning centre runs at a higher rate than a general CNC lathe. The routing decision sets the rate, and if you ask for the routing in the quote, you see which machine the part runs on. The cycle time is the cutting time, which depends on the material, the tolerance, and the toolpath strategy — a part in titanium runs slower than the same part in aluminium, and a part with a tight tolerance runs slower than the same part with a loose band. The facility behind this guide runs 100+ CNC machines including Mazak VARIAXIS I-600 five-axis, Mazak INTEGREX I-250H S mill-turn, TSUGAMI and STAR and CITIZEN Swiss-type turning, and 3/4/5-axis milling at ±0.003 mm and ±0.002 mm turning and grinding.
What does the lead time actually include, and where can the days be cut?
The lead time is the sum of three phases — material, machining, and inspection — and if you read them separately, you can tell where the days sit. The material phase is the bar or billet sourcing: standard sections in common grades — 6061-T6 aluminium, 304 stainless, 1045 carbon steel — sit in stock at a shop that runs volume, so the material is same-day; exotic grades — 718 Inconel, Ti-6Al-4V titanium, 17-4PH stainless — are ordered from the mill and the mill lead time is the bottleneck. The machining phase is the cycle time multiplied by the quantity, plus the setup; the inspection phase is the Hexagon CMM and the report.
The 3 / 7 / 30 day tiers the facility behind this guide quotes map to the three phases. A 3-day lead is a part in stock material, on a machine that is free, with a single setup and a single inspection — a prototype or a simple part. A 7-day lead is a part in stock material, on a routed machine, with two or three setups and a full first-article — a multi-operation part. A 30-day lead is a part in exotic material, with heat treatment, with multiple operations and a full PPAP submission — a production or a high-spec part. If you ask for the tier breakdown in the quote, you see where the days sit.
The lever you control is the quantity and the inspection scope. A standard inspection — Hexagon CMM on the key characteristics and a dimensional layout — is a day; a full PPAP — process flow diagram, PFMEA, control plan, MSA, capability study, dimensional results — is a week. The buyer who asks for the standard inspection gets the 3-day lead; the buyer who asks for the full PPAP gets the 30-day lead. Specify the inspection requirement at the quote stage, and the lead time is predictable.
What does a Cpk or Ppk report tell the buyer, and what does it not tell?
A Cpk or Ppk report is a ratio of the tolerance band to the process spread, and it tells the buyer how much of the band the process is using, but only if the band, the subgroup count, the sampling window, and the sigma algorithm are stated alongside the index. A capability index without those four is a number that cannot be checked, and a number that cannot be checked is a number the buyer cannot rely on. The facility behind this guide reports Ppk ≥ 1.67 initial on key characteristics and Cpk ≥ 1.33 in production, and the band and the algorithm are stated with the index.
The distinction between Ppk and Cpk is the distinction between the initial study and the ongoing production. Ppk — the preliminary capability index — is reported on the initial process study, with a subgroup count and a sampling window that reflect the short-term process. Cpk — the production capability index — is reported on the ongoing production, with a larger sample that reflects the long-term process. The targets are different: Ppk ≥ 1.67 on key characteristics for the initial release, Cpk ≥ 1.33 in production for the ongoing stability. A shop that reports only one index is reporting only one phase.
The honest caveat is the one the index alone hides. A Ppk of 1.85 on a 0.4 mm band (76.1–76.5 mm) is one characteristic on one part, not a blanket capability claim — hold the same process spread against a ±5 µm feature and it fails outright. The index is a ratio, and the ratio is only as meaningful as the band it is measured against. Your move is to ask for the band, the subgroup count, the sampling window, and the sigma algorithm alongside the index, and to ask for the Hexagon CMM report on the specific part. The facility behind this guide supplies all four under ISO 9001:2015, IATF 16949:2016 (design clause 8.3 excluded), and ISO 14001:2015, on 100+ CNC machines.
What material documentation ships with the parts?
The material documentation is the chain that traces the finished part back to the billet it was cut from, and the chain is your evidence that the part is the material the drawing specified. The material certificate from the mill carries the heat number, the chemistry, and the mechanical properties; the incoming inspection verifies the certificate against the bar — XRF or spectrometry — so the material in the machine is the material on the drawing. The routing identifies the machine, the fixture, and the operator at each step, and the inspection report traces the dimensional result to the drawing band.
The documentation that ships with the parts includes the material certificate, the heat treatment record if the part is heat-treated, the CMM inspection report with the dimensional layout, and the certificate of conformity. Under IATF 16949:2016, the traceability chain runs from the melt to the ship — the heat number links to the bar, the bar links to the routing, the routing links to the inspection, and the inspection links to the batch. You can recall a part found at the assembly line back to its heat, and a defect in a heat forward to every part cut from that heat. The facility behind this guide runs the full chain under ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded), and ISO 14001:2015 (116024/B/0001/UK/En).
your move is to ask for the documentation list at the quote stage, not just the inspection report, but the full set of records that link the part to the melt. A shop that runs ISO 9001 alone has the inspection report but may not have the heat-to-part link; a shop that runs IATF 16949 has the full chain. Specify the documentation requirement — material certificate, heat treatment record, CMM report, certificate of conformity, and the traceability chain — and the parts arrive with the evidence.
How do I audit a CNC supplier without visiting the floor?
A remote audit is a documentation audit, and the documentation either holds up or it does not. Your checklist is the same as the on-site audit, minus the physical walk-through. The legal entity is verified first — the Unified Social Credit Code, 18 digits, is the entity's legal identity in China, verifiable on the National Enterprise Credit Information Publicity System. Dongguan Zhuohang Ltd, USCC 91441900MA4UWT6X39, established 2005, is the entity behind this guide, and the registration is verifiable in minutes.
The certifications are verified second. The ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded), and ISO 14001:2015 (116024/B/0001/UK/En) certificates are held by Dongguan Zhuohang Ltd and verifiable with the registrar URS online. You ask for the certificate numbers and the registrar, and the verification is a lookup, not a scan. The machine list is verified third — a list of makes, models, axis counts, and years, cross-referenced against a live video walk-through of the running floor. A shop that quotes a Mazak VARIAXIS I-600 five-axis has a nameplate on the machine that says so; a live walk-through confirms it.
The capability is verified fourth. You ask for a real CMM inspection report from a past job — not a capability statement — and reads the band, the subgroup count, the sampling window, and the index. The facility behind this guide reports ±0.003 mm milling and ±0.002 mm turning and grinding on Hexagon CMM, with Ppk ≥ 1.67 initial on key characteristics and Cpk ≥ 1.33 in production, and a real CMM report shows the band and the index together. A live video walk-through of the floor and the inspection bench is available before travel; you can verify the floor against the quoted list at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan. Book the remote audit through Felipe Iglesias at [email protected] or +86 13126536955, and ask for the certificate numbers, the machine list, and a past CMM report in the same email.
What is the difference between prototype and production at the same shop?
The economic case for prototyping at the production shop is that the setup and first-article work is paid once, not twice. A prototype run at a prototype-only shop produces a part and a report, but the toolpaths, the fixture logic, and the inspection plan stay with that shop; when the file moves to a production shop, every one of those decisions is rebuilt from the drawing, and the rebuild is the second cost and the second risk. If you prototype at the production shop, you get a different deliverable — the validated toolpath file, the fixture design, and the inspection routing carry forward into the production release.
The transfer only works if the shop runs both tiers under the same quality system. A prototype shop with a separate, looser quality process produces parts that pass at prototype and fail at production because the process that made them was not the process that will scale. The facility behind this guide runs prototypes and production under the same ISO 9001:2015 and IATF 16949:2016 system, on the same 100+ machine floor — a part validated on a Mazak VARIAXIS I-600 at prototype is run on the same VARIAXIS I-600 at production, with the same Hexagon CMM reporting against the same band. The tolerance bands — ±0.003 mm milling, ±0.002 mm turning and grinding — apply at both tiers, and the first-article report from the prototype run becomes the baseline against which the production first-article is compared.
The practical move is to ask, at the prototype quote stage, whether the toolpath and fixture files will be retained and reused at production release, and to ask for the first-article report to be re-issued at production as a comparison, not just a fresh report. A shop that agrees to both has nothing to hide; one that treats the prototype as a throwaway has a reason. With an MOQ of 1 piece and lead times of roughly 3 / 7 / 30 days, you can validate the part, iterate the design, and release to volume without re-paying the setup. Contact Felipe Iglesias at [email protected] or +86 13126536955 to set up a prototype-to-production transfer plan.
Ready to get your CNC machined parts made?
Email your drawing to [email protected] or call +86 13126536955 for a DFM review and quote.
Frequently Asked Questions
1. Are you a manufacturer or a trading company?
In short, You are buying from a manufacturer, not a trading desk. The parts are cut in-house at a 6,800 m² facility in Hengli Town, Dongguan, founded in 2005 and staffed by 100+ people, running 100+ production machines — 3-axis (50+), 4-axis (20+), 5-axis (20+), 25+ lathes, and 7+ grinders — with its own CMM and metrology bench.
2. What is the minimum order quantity?
In short, The MOQ is 1 piece. There is no production-only minimum, so you can order a single prototype to validate fit and function before committing to volume, then scale the same part on the same machines with the same accountable supplier.
3. How do I get an accurate quote?
The fastest, most accurate quote comes from a complete request. Four ingredients cover it:
4. What lead time should I expect?
Lead time is set by part complexity and the number of process steps, not by a blanket promise.
5. What materials can you machine?
The material families buyers actually specify, with incoming lots XRF-checked against the mill certificate so the alloy you name is the alloy you receive.
6. What tolerances can you hold?
Tolerances are tied to the process and confirmed on a CMM, not printed as a hope.
7. Which certifications do you hold?
Three third-party-surveyed systems, with certificate numbers you can verify with the registrar rather than taking a logo on faith.
8. What documents ship with my parts?
In short, You should not have to ask for proof after delivery. Depending on the program, the shipment carries a first-article inspection report, a CMM dimensional report, SPC control charts, and a material certificate, so you can audit what was measured rather than take quality on faith.
9. Can finishing and heat treatment be bundled?
In short, Yes. Surface finishing — standard and hard anodizing, zinc / nickel / silver / gold / chrome plating, powder coating, painting, brushing, and mirror polishing — and heat treatment such as vacuum, bright, carburizing, nitriding, and stress-relief aging can ride the same order, so you receive finished parts rather than machined blanks.
10. How do I reach the team?
In short, Email [email protected] or call +86 13126536955. The sales team covers English, Portuguese, Spanish, French, and Chinese, and Japanese, and the factory in Hengli Town, Dongguan is open to visits and audits.
Are you a manufacturer or a trading company?
A manufacturer. The parts are machined in-house at a 6,800 m² Dongguan plant founded in 2005, with 100+ staff and 100+ production machines plus its own CMM and metrology bench. The work is not brokered out to a subcontractor.
What is your minimum order quantity?
One piece. There is no production-only minimum, so you can order a single prototype to validate fit and function, then scale to a production run with the same machines and the same accountable supplier.
How do I get a quote?
Send a STEP or IGES 3D model and a toleranced PDF drawing naming material, finish, and quantity to [email protected]. You receive a design-for-manufacturing review and a quote, usually within one business day.
What lead times should I expect?
Roughly 3, 7, or 30 days depending on part complexity and the number of process steps. Simple parts ship in about 3 days; parts with surface finishing or many operations fall into the longer 30-day tier.
What materials and tolerances do you support?
Aluminum, stainless steel, carbon and alloy steel, brass, copper, titanium, magnesium, and engineering plastics, held to ±0.003 mm on CNC milling, ±0.002 mm on CNC turning and ±0.002 mm on grinding, with key characteristics at Ppk ≥ 1.67 initial.
How are parts verified before they ship?
Critical dimensions are checked on Hexagon CMMs, surface finish on a profilometer, and material composition by XRF against the mill certificate. CMM reports and SPC charts ship with the parts for your own audit.
11. Which materials and industries do you cover?
In short, We machine aluminum, stainless steel, titanium, brass, copper, and Inconel, plus engineering plastics including PEEK and Delrin. These CNC machined parts go into medical, aerospace, automotive, robotics, electronics and defense applications, with the inspection, traceability and documentation each sector requires before it places an order.
What payment methods and terms do you accept?
PayPal, Western Union, and bank or wire transfer. For long-term customers we also accept Net 30, Net 45, and Net 60 terms after an approved credit review.
What happens if a machined part has a manufacturing defect?
We provide free repair or remake for parts with manufacturing defects. All repair and remake costs, including return and shipping, are on us.
How quickly do you respond to inquiries?
We respond to every inquiry within 24 hours. Quotations for standard parts are returned within 48 hours; print reviews and DFM feedback are usually back within one business day.
Standards referenced on this page
- ASTM B211/B211M-19 — Standard Specification for Aluminum-Alloy Rolled or Cold Finished Bar, Rod, and Wire
- ASTM A484/A484M-24 — Standard Specification for General Requirements for Stainless Steel Bars, Billets, and Forgings
- ISO 9001 — Quality management systems — Requirements
